Small Business Website & SEO Guides
Manufacturing RFQ Forms: Get the Drawing, Revision and Quantity to the Estimator
Short answer: A manufacturing RFQ form should keep the part number, drawing revision, requested quantity and drawing together when the request reaches your estimator. Below, we’ll build a one-part request in Jotform and test that association. Receiving an RFQ starts a review; it does not accept a production order or confirm delivery.
Check the website leading to your RFQ
The free scan checks up to 1,000 public pages. Use it for the public website, then test the drawing and estimating handoff separately with the steps below.
Run my free website scanIn this article, you need to know
- RFQ
- A request for quotation: the buyer asks whether you can supply specified work and at what price.
- Revision
- The version identifier on a drawing or design document.
- Estimating handoff
- The request and supporting information passed to the person who reviews and prices the job.
- Notification
- The email alert your business receives when someone submits the form.
Start with the $99 website audit
The $99 Full Website Audit provides human-reviewed findings, affected-page evidence and prioritized recommendations for one authorized website, with no fixed public-page cap, subject to access and technical constraints. Implementation and private form or estimating-system checks are separate.
Choose the $99 Full Website Audit
“Please quote the attached” is a perfectly ordinary email. Finding three attachments called “final” is where the entertainment begins. A useful RFQ keeps the buyer’s declared version and quantity beside the file, so estimating can identify what needs review.
Start with one part and a real estimating owner
This example is for a buyer requesting a newly manufactured part. Repair of an existing machine needs a different conversation. Before building, ask your estimator which information lets them decide whether a request is ready to review. Agree who checks incoming requests and who asks the buyer about missing or conflicting details.
You need a Jotform account, permission to edit the form, a monitored estimating inbox and an approved method for receiving the proposed documents. Check current account submission and storage limits. Do not assume an ordinary public upload is approved for confidential or controlled drawings. If special handling is needed, tell buyers to contact your team before sending files.
For this version, ask for one part per request. A list of five quantities and three unrelated drawings can be legitimate purchasing work, but it needs a form designed to preserve those relationships. A single quantity box cannot explain which part gets which quantity.
1. Build the part, revision and quantity questions
In Jotform’s My Workspace, choose Create → Form → Start from Scratch → Classic Form. Open Add Element → Basic and add the fields below. These are the starting controls in Jotform’s first-form guide.
- Your name — Short Text, required. Identify the person your estimator should contact.
- Company — Short Text, required. Keep the buyer’s company with the request.
- Email address — Email, required. Use the dedicated Email field for the reply address.
- Part number or part description — Short Text, required. Allow a descriptive name when the buyer has no part number.
- Drawing revision — Short Text, required. Add helper text: “Enter the revision shown on the drawing, or write ‘not known’ or ‘no drawing yet.’” A required answer should reveal uncertainty rather than encourage an invented revision.
- Quantity for this request — Short Text, required. Add “Include the unit, for example 25 pieces. Request alternative batch prices in the notes.”
- Specified material and finish — Short Text, optional. Ask the buyer to repeat an existing specification or identify where it appears in the drawing. Leave technical decisions for review.
- Requested delivery date — Short Text, optional. Ask for a written month and year and whether it is a desired or fixed project date. This is the buyer’s request, not your commitment.
- Notes or information still to follow — Long Text, optional. Give missing drawings and early design conversations somewhere useful to go.
For a Short Text field, select it, open its gear icon and set General → Field Label, Required and Sublabels. Jotform’s Short Text guide documents these controls. Keep part and revision identifiers as text: “0042-B” is an identifier, not arithmetic. Use Long Text’s General settings for the notes label and optional status.
Add a Heading from Basic. Its gear icon opens General → Heading Text and Subheading Text, as shown in Jotform’s Heading guide. Use “Request a manufacturing quote” and explain: “Send one part per request. We will review the information and contact you about the next step. Requested dates are subject to review.”
2. Add the drawing only after agreeing how to receive it
If your business approves this upload route, add a File Upload element from Basic as the tenth field. Label it “Drawing for this part.” Leave it optional so a buyer can request a conversation before transferring documents.
Open the field’s gear icon. Under General, set the label and sublabel. State the agreed formats and limits beside the upload. Under Options, enter the approved extensions in File Types and set Limit File Size in KB. Under Multiple, enable Limit Number of Files and enter the agreed count. Jotform’s File Upload instructions explain these settings.
The estimator must choose usable formats; this article cannot prescribe them for every shop. A business receiving one PDF for an initial review will configure a different route from one receiving a drawing and model together. Put the contact-first alternative beside the field. A successful upload does not decide which document controls when a model and drawing disagree.
3. Send the whole request to estimating
Open Settings → Emails and edit the Notification Email with its pencil icon. If none exists, choose Add Email → Notification Email. Set Recipients to your monitored estimating inbox. Jotform’s Starter plan currently permits one notification recipient per form; this example uses one inbox.
Use “Manufacturing RFQ” in the subject. Beside Subject, choose Fields and insert your part and revision fields. Keep the default submitted-answer content in the body, including quantity and the upload field. Under Advanced, check automatic sending when a submission is received, select the buyer’s Email field for Reply-To Email, and save. See Jotform’s notification setup and email-content guide.
In Settings → Thank You Page → Show a Thank You Page, write: “Your RFQ has been received for review. We will contact you about suitability, missing information and quotation. No production order or delivery date has been accepted.” These are Jotform’s confirmation settings.
Open Publish → Copy link to obtain the form address. Add that destination to the RFQ action on your relevant manufacturing service page. For a full website installation example, our contractor form guide demonstrates Jotform on Wix. Keep the manufacturing field choices above.
4. Test two revisions of the same fictional part
Use invented, harmless sample documents and contact details you control. Here is a hypothetical request, not a client record: part EX-042, revision B, 25 pieces, desired delivery 18 November 2026, with a sample file named EX-042-rev-B.pdf.
Submit it from your website on a phone. Check the saved submission and estimating email. Ask the estimator to locate the sample document and read back the part, revision, quantity and requested date. Selecting a file on screen and receiving a usable file are separate checks.
Then send a clearly marked second test for revision C, 40 pieces. Check that nobody could mistake the first quantity for the second revision. Agree a real correction process: the buyer should identify the earlier enquiry when sending a replacement, and staff should confirm which information will be reviewed. Do not silently treat the newest filename as authority.
Finally, try a request without a drawing. The record should make the missing information clear and the confirmation should still promise review rather than production. If email is missing, use our end-to-end form email guide. Give the received request an owner using the lead follow-up guide.
If you want the intake built for you, our New contact or quote form service covers one form on one website, with up to 10 fields, a notification and a confirmation. Share the drawing-transfer requirements before ordering so we can confirm what fits; this listing does not establish a secure engineering-document system.
The Web Mechanic’s rule: a drawing without its revision and quantity is a very detailed way to ask another question.
Plan how suitable buyers find your capabilities
The $989 Authority SEO Strategy Sprint covers one website, up to 30 search phrases, up to three competitors, five priority-page briefs and a 30/60/90-day roadmap, with a 60-minute review with Steve. It is research and strategy; implementation and content production are separate.
Explore the $989 SEO Sprint
Join the conversation
Comments are reviewed before they appear.